Summary of work-MNDot Hwy 15 Improvement Project 2017
- Pavement improvements, resurfacing
- Refurbish or replace traffic signals, and upgrade signals to flashing yellow arrow
- Update traffic signals to include accessible pedestrian systems
- Update pedestrian ramps to meet ADA requirements
- Remove and replace sections of poor sidewalk and curb and gutter
- Perform spot repairs of the existing storm sewer lines
- Pavement improvements, resurfacing
- Refurbish or replace traffic signals, and upgrade signals to flashing yellow arrow
- Update traffic signals to include accessible pedestrian systems
- Update pedestrian ramps to meet ADA requirements
- Remove and replace sections of poor sidewalk and curb and gutter
- Perform spot repairs of the existing storm sewer lines